LIST OF ALL POSTS

26/5/2015 - Welcome - The Story Begins.
26/5/2015 - Pre-purchase Inspection.
26/5/2015 - Touchdown.
26/5/2015 - New Home New Custodian
26/5/2015 - Restoration Preparation
28/5/2015 - Electrical
2/6/2015 - Restoration Plan
7/6/2015 - Pre Disassembly Photos
7/6/2015 - Rear Wing and LH Rear corner removed
10/6/2015 - Day 2 Dismantling
10/6/2015 - RH Rear Dismantling
15/6/2015 - Gearbox Removal
17/6/2015 - Engine Removed
19/6/2015 - Restoration Progress Report
20/6/2015 - Feedback and the Milwaukee Torque Wrench
23/6/2015 - Gearbox Dismantled 
24/6/2015 - Wheels
26/6/2015 - Front Suspension Removed
27/6/2015 - Suspension Items for Duplication
30/6/2015 - Fuel Bags : Part 1
7/7/2015 - Brakes
10/7/2015 - Fuel Bags Part 2 and Restoration Progress
14/7/2015 - Suspension Uprights Dismantled
14/7/2015 - Engine Rebuild : Post 1
24/7/2015 - Engine Rebuild - Dis-assembly : Post 2
30/7/2015 - Crack Testing : Batch 1 Suspension components
3/8/2015 - Steering Rack Removal & Disassembly
7/8/2015 - Engine Rebuild - Complete Dis-assembly : Post 3
14/8/2015 - Car Fully Dismantled
15/8/2015 - Rebuild Progress (new wing and some repaired components)
24/8/2015 - Crack Testing Batch 2 & New Suspension Wishbones
28/8/2015 - Front Uprights Reassembly
6/10/2015 - Rear Uprights & Steering Rack reassembly 
9/10/2015 - Gearbox Rebuild : Post 1
18/10/2015 - Gearbox Assembly : Post 2
23/10/2015 - Restoration Progress Report
3/11/2015 - Gearbox Rebuild (Complete) - Post 3
14/11/2015 - New Suspension, Brakes and Steering Column completed
7/12/2015 - Progress Update (Actually not much progress)
5/4/2016 - Three Months Passed - Time to amp up progress
15/4/2016 - Bare Tub - Prior to assembly
22/4/2016 - Some Assembly Progress (finally)
28/4/2016 - Front Suspension mounted
17/05/16 - Engine Assembly : A little bit of progress
28/5/2016 - Front End Assembled : End May progress
20/6/2016 - Engine Rebuild Progress
17/8/2016 - Engine Rebuld complete and New Fuel Bags Installed
13/9/2016 - Engine and Gearbox Installed
17/9/2016 - Rear Components Part Assembled
15/10/2016 - Left Rear assembled
18/10/2016 - Right Rear Assembled
16/11/2016 - Suspension Setup and Wiring
24/11/2016 - Liftoff
13/12/2016 - Dyno Update
22/12/2016 - Dyno Run Results / Finished Project
20/11/2017 - Race Meeting No.1 - Eastern Creek (SMP) HSRCA event 11-12 Nov 2017
20/7/2018 - Water Pump minor leak : replacement and rectification
For Sale - BRM P160E-10